Professional Wetroom Installation
Built for comfortable everyday use
Every wetroom begins with an assessment of the existing floor structure, available drainage and required layout. We prepare the area, form the correct falls toward the drain, waterproof the required floor and wall areas, complete the tiling and install the agreed screen and fittings.
Wetroom installation
From planning to handover
Assessment and layout planning
The room, existing floor construction and available drainage routes are assessed before work begins. A wetroom is only recommended where the necessary drainage and floor falls can be created without weakening or damaging the structure. The layout is then planned around the available space and the customer’s requirements.
Floor structure and drainage
The floor is opened to confirm the direction of the joists, the available depth and a suitable route for the waste pipework. The area beneath the wetroom tray is reinforced before the tray is securely installed, providing the correct falls towards the drain. If level access cannot be achieved safely, the available alternatives are discussed before work continues.
Wall and floor preparation
Walls and surrounding floor areas are carefully assessed before finishing work begins. Walls are repaired, reinforced, boarded or plastered where required. Floors are stabilised and levelled as necessary to create firm, even surfaces around the installed wetroom tray.
Waterproofing system
The wetroom tray, entire floor and required wall areas are waterproofed using a suitable tanking system. Corners, joints, the drain connection and areas around pipework are carefully sealed to create a continuous watertight barrier before tiling begins.
Electrical work and ventilation
Required electrical work can be coordinated for lighting, extractor fans, illuminated mirrors, shaver points and electric underfloor heating. The position of each fitting is planned to suit the wetroom layout and the relevant electrical safety zones.
Tiling and final installation
Tile layouts are planned around the wetroom tray and drain, with careful attention to alignment, cuts, trims and grout colour. Floor tiles are fitted to maintain the correct falls and achieve a neat finish around the drain. The shower screen, sanitaryware, bathroom furniture and agreed fittings are securely installed in their planned positions.
Sealing, testing and handover
Final joints and edges are finished with sanitary silicone sealant, and any remaining finishing details are completed. The wetroom is then cleaned and reviewed with the customer at handover.
See the standard of our work
Explore completed bathroom, wetroom and tiling projects, or read genuine feedback from previous customers.
Ready to discuss your project?
Contact us to arrange a free home visit, discuss your requirements and receive a detailed quotation.